Cambridge (ON) fire dispatch received a 9-1-1 call for fire in a large industrial complex February 22, 2019 at 19:25. A3, P1, A6, P2, R1, and Car 6 were dispatched on the first alarm. A3 arrived on scene reporting light smoke showing from a middle unit of a 225 x 60’ industrial building. The fire had a good hold of the roof. The roof was steel on top and bottom and had multiple layers of asphalt from repairs and new roofs added to the building over the years.
Both aerials and multiple hand lines were pulled to attack the fire as firefighters did what they could to peel the roofing off to get at the fire. The roof was buckling, so no firefighters were allowed near the seat of the fire. Trench cuts were made to stop the fire from spreading to adjacent units. This was a very stubborn fire. Overtime crews were called in to staff spare apparatus. All six stations and the overtime crews were rotated to the scene to fight the fire. The fire was not declared out until 8:25 the following morning after a lot of hard word. Box 690 provided rehab at the fire. Photos and video taken two hours into the fire.
Sunday (2/25) was an intensely windy day in the Chicago area which made for difficult firefighting conditions. The second 2-11 alarm for Chicago on this day was at 88th Street and Commercial Avenue and started in a pizza parlor that had occupied that address since the 1950’s. The fire was reported to have started in the rear of the structure and heavy winds blowing across from the west quickly escalated the incident. Eric Haak
STRATFORD, CT – Shortly before 1:00am on January 13, 2019, the Stratford Fire Department began receiving multiple calls for a fire at the historic Shakespeare Theatre at 320 Shore Rd. First units on scene found the unoccupied, vacant structure heavily involved and immediately started calling for more resources. Mutual aid responded to the scene from Bridgeport and Milford.
Kitchener (ON) fire dispatch 9-1-1 lines lit up at 8:10 August 22, 2018 for an explosion and fire at 56 Sprucedale Crescent on the west side of town. The initial dispatch was for an explosion and possible fire. Two pumps, 100’ quint platform, heavy rescue, and platoon chief were dispatched. Heavy smoke was visible as trucks were responding and a third pumper was requested to the scene.
P5 arrived first and reported debris all over the area with multiple houses on fire and stated they were going to look for victims. Neighbors reported there could be multiple people in the house. The adult male was pulled from the back yard by homeowners bordering the house. They told firefighters there was a female in the ruble at the rear but they couldn’t get to her due to heavy fire. Firefighters found the adult women and pulled her from the debris and reported she was 10-45.
The fire extended into homes on either side of the house that exploded. Two additional pumpers were requested to the scene. Two commands were set up, one to look after the initial house and the house on the E4 side. The second command looked after the well involved house on the E2 side. A sixth pumper was requested a short time later.
Four hydrants were picked up, three on Sprucedale and one on Blackwell Drive where firefighters pulled a 2.5” line into the rear of the fire. Multiple small and large lines as well as the platform attacked the fire from the front. The bulk of the fire was knocked down in 45 minutes on the original home and E4 home. The E2 home had heavy fire throughout the house and eventually fire broke through the steel roof. Firefighters worked for hours on spot fires and securing the scene.
Due to the magnitude of the call, media and helicopters arrived from as far away as Toronto. Kitchener Fire Chief Jon Rehill updated press throughout the day. Sixteen homes were evacuated and gas was shut off to their homes until the source of the blast could be determined. The Ontario Fire Marshall arrived at noon to help in the investigation.
The following day, Regional Police reported they were investigating the fire as a homicide. The adult male was airlifted in critical condition to a Hamilton hospital. Damage will exceed two million dollars. Box 690 provided rehab for nine hours. Photos and video taken 25 minutes into call after rehab was set up.
On 1/21/2019, the Hollis Fire Department (NH) was dispatched to a reported garage fire. Companies had heavy smoke showing and requested mutual aid engines and tankers to the scene. The fire was brought under control within the hour. Firefighters had to deal with a temperature of 0 degrees and wind chills as low as -21. Brookline, Amherst, Nashua, and Pepperell assisted at the scene. Additional photos