New Hamburg was toned out at 17:45 for a fire in the shop at 1527 Holland Mills Road. Baden was requested on a second alarm once New Hamburg confirmed with dispatch that there was a fire. New Hamburg arrived on scene reporting heavy smoke showing from a 100 x 100’ butcher shop. Numerous small and large lines were pulled around the building. A severe thunder storm rolled through the area just as the crews were fighting the fire.
Dispatch asked command if any Baden units were available on scene. They had a report of a building collapse with a trapped victim on Settlement Road in the northern end of their township. Command couldn’t free up any units. Wellesley Township, Wellesley station was dispatched to the call, reporting a 40 x 80’ building down 50’ feet from its foundation. The victim was out of the building on arrival. Due to the severe weather, firefighters were pulled from the roof until the storm passed.
New Dundee Fire was at a wires down call, just a few miles down the road. They advised they could free up the tanker and manpower if needed. Command requested their tanker and any manpower they could send. They sent their spare pumper and tanker to the scene. Firefighters worked interior and on the roof for hours trying to knock the fire down. A high hoe was brought in to pull the roof apart. The fire was declared out at 2:00. Box 690 provided rehab serving dinner and 200 cold drinks to the 35 firefighters on scene.