Gary Dinkel

All posts tagged Gary Dinkel

Waterloo (ON) P1, P3, A1, and Car 23 were dispatched to a confirmed fire at 515 Conestoga Road January 6, 2018 at 21:50. Waterloo Regional Police responded to the building for a burglar alarm and discovered the fire. Car 23 had P4 added to the call as P3 was down one firefighter from a med call. P3 arrived and reported they had smoke coming from the large building and requested P1 pick up a hydrant on the way in. Firefighters pulled a 2.5” line and went into the building to attack the fire. A second 1.75” line was also charged and put to work inside the car repair shop. The fire was knocked down in 15 minutes. Overhaul took another hour. Box 690 provided rehab at the fire, pictures taken 20 minutes into the call. Temperatures were a bone chilling -11 F. This was our second fire of the day having provided rehab at a large fryer fire in a poultry plant in Cambridge.

Gary Dinkel, Box 690 Rehab

Waterloo Ontario firefighters at work

Gary Dinkel photo

Waterloo Ontario firefighters at work

Gary Dinkel photo

Waterloo Ontario firefighters at work

Gary Dinkel photo

heavy smoke from warehouse fire

Gary Dinkel photo

firefighters remove overhead door at fire

Gary Dinkel photo

firefighters remove overhead door at fire

Gary Dinkel photo

firefighter uses PPV at commercial fire

Gary Dinkel photo

St Clements and Linwood (On) were dispatched for a structure fire at Broadway Metals, 3002 Broadway Street November 26 2017 at 22:00. Dispatch reported tires on fire beside the building. St Clements requested Wellesley’s tanker on route to the call. Pump 2 arrived on scene reporting heavy fire on the E3 side of the building with possible extension into the office. P2 set up for drafting and pulled multiple lines. Linwood P1 set up at the fire department reservoir located on the E1 – E4 side of the building. A four-inch line was deployed to the rear of the building from P1 and a portable hydrant was set up. Multiple lines were run off the portable hydrant. Command reported multiple double stacked skids with rubber dock bumpers on fire below grade beside the building. St Clements firefighters reported minor extension into the attic of the business. Command requested Wellesley’s aerial and rescue respond with manpower. The heavy fire was knocked down in 25 minutes with overhaul taking another couple of hours. The Ontario Fire Marshal was called in to investigate the suspicious fire. Box 690 provided rehab for 3.5 hours, our second fire that day. Members got to bed at 2 am and half an hour later were out to the Ellis Road fire in Wellington County, photos posted back in November. Photos taken 25 minutes into the fire.

Gary Dinkel, Box 690

Wellesley Township fire engine

Gary Dinkel photo

fire engines drafting from portable tanks at night

Gary Dinkel photo

firefighters at industrial fire

Gary Dinkel photo

Bobcat skid steer at fire

Gary Dinkel photo

firefighters at industrial fire

Gary Dinkel photo

Bobcat skid steer at fire

Gary Dinkel photo

rubber slats smolder on pallet

Gary Dinkel photo

fire engine drafts from sister

Gary Dinkel photo

Thibault aerial fire truck

Gary Dinkel photo

Box 690 Rehab unit

Gary Dinkel photo

Wellesley Township fire engine at work

Gary Dinkel photo

firefighters at industrial fire

Gary Dinkel photo

Waterloo (ON) P1, A1, P4 and Car 23 were dispatched to a house fire at 87 Bridge Street West December 17, 2017 at 05:05. Car 23 was advised callers were reporting lots of visible fire from the house under renovation. The platoon chief requested an additional pumper, P3 after hearing the report. Pump 4 arrived on scene and reported a fully involved house fire with exposure problems on side B and D. Aerial 1 was set up in front of the building for tower operations. P4 pulled multiple lines from their truck as well as a 4” feeder line to A1. Pump 4 officer reported he was unable to do a complete 360 due to high radiant heat. Two, four-inch lines were hooked up from a hydrant right beside P4 to feed their pumper. The roof and second floor collapsed into the basement approximately 20 minutes into the call. Firefighters were able to protect all exposures. A car on the B side of the fire had a cracked front window and slightly melted side mirror. Damage has been pegged at $500,000 and the Ontario Fire Marshall has been called in to investigate the suspicious fire. Box 690 on scene providing rehab on this cold night, temperature was 12 F. Photos taken 25 minutes into the fire.

Gary Dinkel, Box 690

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

Waterloo fire trucks at work

Gary Dinkel photo

Waterloo fire trucks at work

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

house fire in Waterloo Ontario

Gary Dinkel photo

Waterloo FD Pump 4

Gary Dinkel photo

Waterloo FD Pump 4

Gary Dinkel photo

Waterloo FD Pump 4

Gary Dinkel photo

Waterloo FD Pump 4

Gary Dinkel photo

house destroyed by fire in Waterloo Ontario

Gary Dinkel photo

Kitchener (ON) fire dispatch received multiple calls for a fire October 22, 2017 at 17:35. P3, P4, A2, R1, and Car 23 were dispatched for a house fire near 266 Zeller Drive. Car 23 asked what details dispatch had on the call and the address was updated to Wild Meadow Street near Zeller Dr. It was a house under construction, and they were receiving multiple calls reporting fire on the second floor. P2 was added to the call as the RIT enroute to the fire. P3 arrived first reporting a large, 2.5-story house under construction with heavy fire showing on the E2-E3 corner, second floor. P3 attacked the fire from the outside awaiting P4’s arrival. P4 arrived a minute later and established a water supply and pulled a backup line.

Two 1.5” lines were pulled upstairs to attack the fire. R1 performed a primary search in the basement and on the first floor. Firefighters appeared to be getting a handle on the fire when smoke dramatically changed colour. Interior crews reported they had a flashover in the washroom. Command ordered the crews out and to go defensive.

Firefighters set up P3’s aerial for a master stream attack and pulled a 2.5” line to fight the fire from the exterior. The fire was knocked down fifteen minutes later. Crews reentered the structure to check for extension and to knock down the remaining hot spots. Box 690 provided rehab.

Early shots by Box 690 member Mike Wilson. I arrived on scene approximately 15 minutes into the call.

Gary Dinkel, Box 690

Kitchener firefighters battle house fire

Mike Wilson Box 690

Kitchener firefighters battle house fire

Mike Wilson Box 690

Kitchener firefighters battle house fire

Mike Wilson Box 690

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Kitchener firefighters battle house fire

Gary Dinkel photo

Cambridge, Ontario Pump 1, Aerial 2, Tanker 1, Rescue 1, and Car 6 were dispatched for a house fire at 6571 Ellis Road November 27 2017 at 2:30. A smoke detector alerted the resident who was able to get out safely with his dog. Cambridge covers this portion of Wellington County under contract. A2 arrived on scene reporting a fully involved bungalow with no exposures. A2 pulled into the driveway and pulled multiple lines. Puslinch fire was dispatched to the scene once Cambridge reported the working fire.

Port-a-tanks were set up on the road and water was relayed into A2. Puslinch responded with two pumpers, two tankers, a 75’ quint, and a heavy rescue. Two additional tankers were requested from Rockwood fire. Water was shuttled from a hydrant in Cambridge approximately a mile and a half from the scene. Firefighters worked for over an hour to knock the fire down.

Photos were taken 40 minutes into the incident. Box 690 provided rehab. This was the second time in a week that we had back to back serious fires. This was our third fire in less than 12 hours having done a kitchen fire in Waterloo the previous afternoon, and a Wellesley fire later in the evening.

Gary Dinkel, Box 690

firefighters battle house fire

Gary Dinkel photo

firefighters battle house fire

Gary Dinkel photo

firefighters battle house fire

Gary Dinkel photo

firefighters battle house fire

Gary Dinkel photo

firefighters battle house fire

Gary Dinkel photo

firefighters battle house fire

Gary Dinkel photo

Canadian firefighters shuttle water to fight house fire

Gary Dinkel photo

fire engine at fire scene in Canada

Gary Dinkel photo

Cambridge ON P1, P2 A3, A4, R1, and Car 6 were dispatched to a possible fire on Sheffield Street November 20, 2017 at 13:50. Pump 2 reported smoke visible just after they left their hall two blocks from the fire. Heavy black smoke pushing from cracks and windows greeted firefighters as they arrived. All firefighting was defensive from the start. The building was brick with a truss roof measuring approximately 300 x 200’. The warehouse was used to store recycled cardboard and paper, plastic auto parts, acetone, and unknown chemicals. Fire was through the roof at the BC corner within 20 minutes of arrival and five minutes later part of the wall collapsed.

Both aerials were set up, and multiple 2.5” lines and monitors were deployed. Regional Police were asked to evacuate businesses downwind of the fire. Area residents were instructed to shelter in place and close all windows. Command was concerned with the runoff from the fire. City public works employees diked storm sewers as best they could to try to prevent runoff from flowing into the Speed River 300 feet away. Reserve A33 responded to the scene with overtime crews at 16:30. Additional firefighters were called in to staff the tanker and spare pumper.

The fire eventually spread through the entire building. All three aerials were used to fight the fire. There were numerous collapses over the next few hours. Heavy fire continued to burn throughout the building all night.

9-1-1 lines int the City of Guelph, 17 miles north west of Cambridge, were jammed with people phoning in to report the smell of acrid smoke in the area. A backhoe was brought in to start pulling the remaining walls down to allow firefighters to get at numerous hot spots throughout the building. Firefighters were still on scene as of 19:30 November 22 as I typed this report.

Cambridge Fire Prevention is working with the Ontario Fire Marshall to look for the cause of the $1,000,000 fire. Box 690 provided rehab for the first ten hours of the fire and was back on scene the next day topping up supplies. Cambridge had a small garage fire during this incident as well as a two serious auto accidents; one involving a patient being flown out on air ambulance. I arrived on scene 20 minutes after the dispatch. I got home at 2:00 and was back on the road 30 minutes later to a large shed fire in Wellesley Township on Road 116, 21 miles from our hall.

Gary Dinkel, Box 690

[Best_Wordpress_Gallery id=”6″ gal_title=”Cambridge 2-alarm fire”]

Kitchener (ON) P3, P2, A2, R1, and Car 23 were dispatched to smoke coming from 15 Perkell Place November 14, 2017, at 12:26. P3 arrived first reporting smoke showing. Captain P3 reported heavy fire in the basement after doing a 360. Car 23 requested an additional pumper to the scene after hearing the size up. Firefighters tried to make entry to the basement but had to pull out due to untenable conditions. A piercing nozzle was used at the front door to knock most of the fire down. Shots were taken approximately 12 minutes after crews arrived. Box 690 provided rehab.

Gary Dinkel, Box 690

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario fire truck

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

firefighters change SCBA bottles on scene

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario house fire scene

Gary Dinkel photo

Kitchener Ontario fire truck

Gary Dinkel photo